Survey & Reporting Costs
Land Contamination Specialist
Costs
Pricing for tree surveys, soakaways, ecology, geotech, asbestos, SuDS and flood risk assessments are all priced on a case by case basis and are dependent on the size and type of site to be surveyed. For a specific quote for any of these services, please contact us for a free, no obligation quote.With land contamination, Phase 1 Reports can be named a number of different ways, including: Phase 1 Desk Studies, Phase 1 Desktop Survey, Phase 1 Land Contamination Risk Assessment and Phase 1 Investigation, among other terms. Guidance on each of the four stages can be found here.
Phase 1
Preliminary risk assessment with a walkover and a desktop survey
Priced from £695
Phase 2
Intrusive site works to take soils samples for laboratory testing
Priced from £1500
Phase 3
The remediation strategy concerning the technical detail to make your site safe
Priced from £395
Phase 4
The verification evidence with proof that your site is now safe for its intended use
Priced from £395
Our Fee Structure
Castledine Environmental are often asked about our prices. We are competitively priced and open and upfront with our costing structures, with these set out below:
Phase 1 Desktop Survey with no walkover £645
(Only if your Local Planning Authority agree)
Turn-around time approximately eight working days from instruction
Turn-around time approximately eight working days from instruction
Phase 1 Desktop Survey with walkover* £695
(This is the accepted Standard)
Turn-around time approximately eight working days from walkover
Turn-around time approximately eight working days from walkover
Phase 2 Intrustive Site Investigation* From £1500
(Soil Sampling)
Turn-around time approximately two to three weeks
Turn-around time approximately two to three weeks
Phase 2 Intrustive Site Investigation*From £3000
(Ground gas monitoring)
Turn-around time dependent on gas monitoring duration
Turn-around time dependent on gas monitoring duration
Phase 3 Remediation Strategy and Verification Plan£395
Turn-around time approximately seven working days
Phase 4 Verification Report£395
Turn-around time approximately seven working days from site visit
Coal Mining Risk Assessment (CMRA)£495
Turn-around time approximately eight working days from instruction
Air Quality AssessmentFrom £1850
Standard and Impact Assessments available
Turn-around time approximately eight working days from instruction
Turn-around time approximately eight working days from instruction
UXO ReportFrom £200
Preliminary and Detailed UXO Desk Studies & Risk Assessments
*Travel to site will be charged at 50p per mile and £25.00 per hour travelled
(Note: Sometimes, additional information is required, such as a Coal Mining Report. As such, this would be communicated to you on instruction
(Note: Sometimes, additional information is required, such as a Coal Mining Report. As such, this would be communicated to you on instruction